Last week the contractor continued to excavate and place stone base for the roadway from Pauline Ave. to Newtown Dr.[...]
South Section: Lake Cook Road to Deerfield Parkway
Project Update 4/29/2020
Last week the contractor completed pavement removal on the east side of Weiland, started earth excavation and stone base placement,[...]
Project Update 4/17/2020
The roadway has been temporarily patched where the box culvert was constructed at the Aptakisic Creek. There will be a[...]
Project Update 4/2/2020
The concrete work for the culvert and retaining walls at Aptakisic Creek is complete, and the railing is being installed.[...]
Project Update 3/20/2020
Construction continues on the Aptakisic Creek culvert with work focused on the poured in place headwall and retaining walls. Work[...]
Project Update 3/12/2020
Traffic has been moved onto the temporary pavement (same configuration as last fall) to allow the resumption of work on[...]
Project Update 3/5/2020
Next week (March 9th) traffic will be shifted back to the Stage 1 configuration from last fall. This shift will[...]
Project Update 3/3/2020
Work continues on the west half of the box culvert. Visit the Gallery Page to view a video of the[...]
Project Update 2/21/20
Water main work near the box culvert has been completed, and work on the west half of the box culvert[...]
Project Update 12/23/19
Storm sewer installation on the east side of Weiland Rd is finished for the year. The large diameter main line[...]