Weiland South
Work completed recently
- Excavation and stone base placement for the 8’ wide shared use path
- Installation of street light foundations and conduits along the southbound lanes
- Installation of topsoil and preparations for landscaping
- Concrete curb and gutter placement
- Asphalt pavement was placed in the center to complete the base layers
Upcoming work
- Final asphalt surface placement began 11/5/2020 and will be complete by Monday 11/9/20
- Electrical work; street light foundations and wiring
- Installation of permanent street light poles scheduled to begin week of 11/9/20
- Landscaping preparations and sod placement
- Final pavement markings scheduled late in week of 11/9/20

Hot mix asphalt surface compaction operation South of Newtown Dr. on Weiland Road.

Hot mix asphalt surface laydown operation on Weiland Road.