Project Update 3/12/2020

Traffic has been moved onto the temporary pavement (same configuration as last fall) to allow the resumption of work on the east side of the road. Excavation for the road bed and storm sewer installation are ongoing. Work continues on the Aptakisic Creek box culvert on the west side with the forming of the retaining walls.

 

Please drive carefully through the construction zone and watch for workers and equipment.