Project Update 10/18/19

  • Installation of the 4.5′ diameter storm sewer has started from Aptakisic Creek south towards Newtown Drive. Trucks are parked on the east side of road within the park area to brace utility poles as this work passes by. Storm sewer installation crossing Newtown Drive will take place Thursday 10/17 and Friday 10/18. Installation will continue south of Newtown Drive next week.
  • Water main replacement has also started on the east side of the roadway at Pauline Ave and will continue north towards Pope Blvd.
  • The east half of the existing culvert at the Aptaksic Creek has been removed and the new 12′ wide x 7′ tall precast concrete box culverts have been installed. Work is continuing on that side to build a cast-in-place concrete headwall and soldier pile wingwalls at the end of the culvert. The walls will act as a retaining wall so the roadway can be widened and provide an 8′ wide shared use path and grass area on that side.

Stay tuned to the website for future updates.

Please drive carefully through the construction zone and watch for workers and equipment.

 

Visit the Gallery Page for construction site webcam.