New Staging Pattern!

Aptakisic Road from Joseph Court to Industrial Drive will enter the new construction staging pattern today as part of the reconstruction of Weiland and Aptakisic Roads.

The new traffic pattern will reduce the number of through lanes to 1 in each direction to allow the reconstruction of the roadway. New rail crossing signals will be installed as well as new drainage system and pavement structures.  Left turn lanes will be maintained at Weiland Road in the westbound direction, as well as left turns at Bond Street in the eastbound direction.

Stay tuned to the website for future updates.

Please drive carefully through the construction zone and watch for workers and equipment.