Weiland North
Work completed
Weiland Rd –

• Pavement removal in preparation for storm sewer installation
• Electrical installations
• Traffic staged northbound from North Abbott to Aptakisic
• Landscape grading
Aptakisic Rd –
• Earth excavation and stone base placement for the future eastbound lanes
• Storm sewer installations
• Concrete curb and sidewalk
• Sidewalk base preparation
• Landscape grading

Upcoming work
Weiland Road –
• Earth excavation, landscape grading
• Stone base placement
• Asphalt temporary pavement installation
• Landscaping
• Late week of the week of 11/09: Southbound Weiland Road traffic will be shifted onto the new pavement on the east side of the road to allow reconstruction of the west side to begin, which will continue through the winter.

Aptakisic Road –
• storm sewer installations
• asphalt pavement placement for eastbound lanes from Weiland Rd to Bond St, week of 11/9/20
• landscaping
• Canadian National RR will begin installation of their permanent lights and gates week of 11/9/20

Proposed Weiland Road south bound lanes near Abbott Court.