Weiland South
Work completed recently

  • Excavation and stone base placement for the 8’ wide shared use path
  • Installation of street light foundations and conduits along the southbound lanes
  • Installation of topsoil and preparations for landscaping
  • Concrete curb and gutter placement
  • Asphalt pavement was placed in the center to complete the base layers

Upcoming work

  • Final asphalt surface placement began 11/5/2020 and will be complete by Monday 11/9/20
  • Electrical work; street light foundations and wiring
  • Installation of permanent street light poles scheduled to begin week of 11/9/20
  • Landscaping preparations and sod placement
  • Final pavement markings scheduled late in week of 11/9/20

 

Hot mix asphalt surface compaction operation South of Newtown Dr. on Weiland Road.

Hot mix asphalt surface laydown operation on Weiland Road.